FeiDa FY300B |
The weight (T) |
8 |
The hole diameter (mm) |
140 - 325 |
Drill depth (m) |
300 |
One - time advance length (m) |
6.6 |
Walking speed (km/h) |
2.5 |
Gradeability (Max.) |
30 |
Equipped capacitor (kw) |
85 |
Working air pressure (MPA) |
1.7 - 3.0 |
Air consumption (m³/min) |
17 - 36 |
Swing speed (rpm) |
45 - 70 |
High leg stroke (m) |
1.4 |
Drill pipe diameter (mm) |
Φ76 Φ89 Φ102 |
Drill pipe length (m) |
1.5/2.0/3.0/6.0 |
Rig lifting force (T) |
18 |
Rapid rise speed (m/min) |
22 |
Fast feeding speed (m/min) |
40 |
Width of loading (m) |
2.6 |
Hoisting force of winch (T) |
2 |
Swing torque (N.m) |
5700 - 7500 |
Dimensions (mm) |
5900*1850*2200 |
The penetration efficiency (m/h) |
15 - 35 |
The engine brand |
yuchai |
|
|